00:00:24 - Pouring water. I refined my faux fluid setup from earlier projects, replacing full liquid sims with a combination of rigid body sims, particle sims (for the bubbles), and procedural geometry.
As a result of my system, we were able to reduce the bid time for the entire episode's FX production from 22 days to 4 days.